Project experience

A selection of the operations we have engineered and followed offshore.

Oil & Gas · Subsea

Spool installation

Installation engineering for subsea spools: installation analysis, lifting and deployment procedures, and offshore follow-up.

Oil & Gas · FPSO

Riser hook-up

Riser installation engineering, with technical detailing of pull-in operations and cable connections on FPSOs.

Read the related post

Subsea · Cables and umbilicals

Subsea cable laying

Launch analysis and laying tables that preserve the mechanical properties of risers, umbilicals and cables during installation.

Read the related post

Installation analyses

Structure deployment package

An execution-ready package for subsea structure deployment: installation analysis and methods, integrated drawings, offshore transportation and structural analysis.

Read the related post

Installation

Offshore lifting

Lifting analysis and procedures for offshore operations, with structural verification and FEA of installation aids.

Transportation

Subsea structure transportation plan

Load-out, seafastening and offshore transportation analysis for subsea structures, through to structural verification.

From our LinkedIn

Recent studies and project highlights shared by the Infinisea team.

Follow Infinisea

LinkedIn

Launch analysis, JMC connector FEA and laying table

The launch analysis presented highlights the importance of calibrating dynamic models.

  • Hydrodynamic coefficients derived from tank tests and real operational data, to accurately predict curvature radii and stresses at critical points.
  • Detailed assessment of the JMC connector using Finite Element Analysis (FEA), focused on stress distribution and interface loads under combined tensile, bending and external pressure loads.
  • Stability and launch geometry (laying table), to preserve the mechanical properties of risers and umbilicals.
  • Naval engineering
  • Structural analysis
  • Risers and umbilicals
Read the full post

LinkedIn

Recent installation studies

What our recent installation studies cover, from simulation to the offshore campaign.

  • High-fidelity simulation and calculation.
  • Structural integrity via FEA.
  • Installation engineering planning: laying tables, task plans and procedures.
  • Offshore follow-up: the personnel to follow the operation offshore.
  • Subsea
  • Installation engineering
Read the full post

LinkedIn

Highlights from recent projects

Some highlights from recent projects.

  • Dynamic mooring analysis: hydrodynamic calibration for ultra-shallow waters using real tank test data.
  • Structural integrity (FEA) of components such as bend restrictors.
  • Riser installation engineering: technical detailing of pull-in operations and cable connections on FPSOs.
  • Oil & Gas
  • Mooring
  • FPSO
Read the full post

Let's talk

Have an offshore project in mind?

From a single analysis to a full offshore campaign. If you have a specific project in mind, get in touch and we will discuss it together.